Main tests could be performed during an inspection at the factory, and the choice of tests to be carried out varies according to the design and intended use.

Zipper test Smell check
Pocket check Waterproof test
Lobster Clasps test Export carton drop test
Nail test Seam strength check
3M tape Logo test Barcode scanning test
Luggage set up test Rolling tests/Durability test
Fitting test Color fastness test
GSM Check Metal detection test
Inside stuffing check Stitches per inch check
Static and Dynamic loading test of handle

Testing on material or products are required to analyze the compliance with the standards and regulations of your destination country, our can help the client to draw samples to partner accredited laboratory for testing , we can also forward the shipping samples while During-Production Inspection or Pre-shipment Inspection.

The testing normally including Flammability, REACH, CPSIA, Phthalates, Proposition 65, AZO EN14362-1&2

Normally the testing will take around 3-10 days to get the test report, we recommend a selection of test applicable to safety risks and compliance, any questions please contact us : info@ovitte.com .